The steel gable frame will form the entrance for the barn, getting the level right is important.
We had to dig the trench which was really hard work- about 5 hours, for the frame to sit on and for the dwarf retaining wall.
Good job we could use the laser level to sort out the levels.

The builder lasted an hour and I lasted 5 hours



Pretty messy boulder clay


The laser was great at getting the level we needed
 All of the earth outside is to be lowered later 

The challenge was to try to get the level of the front and back room sorted out in the end we went up 100mm 