We had to dig the trench which was really hard work- about 5 hours, for the frame to sit on and for the dwarf retaining wall.
Good job we could use the laser level to sort out the levels.
The builder lasted an hour and I lasted 5 hours
Pretty messy boulder clay
The laser was great at getting the level we needed
All of the earth outside is to be lowered later
The challenge was to try to get the level of the front and back room sorted out in the end we went up 100mm