Some heavy rain resulted in a lake out at the front of the barn so we bought a pump which seems to do a good job.
The following pictures show the rest of the framing- there was an issue- the gable frame is set to 35 degrees and that side of the roof is 32.5 degrees so it took a lot of head scratching to sort out the valleys.
The next job is to fill in the gable ladders and fill in the stone work at the gables then we can add insulation and felt and batten.
One side of the gable frame completed
Scenic View
Completing the valleys
Ski Slope- 9x1
Finishing off- complex jointing
Barge boards and Facias
All that was left from a vast amount of timber
The inside of a Builders van