Sunday, March 18, 2018

Cae Helygen Barn December to March 2018

Lots has been going on recently and the end is in sight..
Bathroom and loft bedroom- window fitted rooms plastered including including distressed wood to the bedroom wall.
Kitchen- kitchen nearly finished
Downstairs bedrooms- floorboards to one wall, Jen has painted the ceilings and walls.
Window ledges finished.
Living room all plastered and Sarah has painted the ceiling.
Second fix electrics- all going in now.
Skirtings and architraves bought along with doors from Venables Oak in Shropshire.

 Building the stud work for the loft bathroom and bedroom 


 James put a vent into the roof for the loft bathroom 
 Sarah painting the living room ceiling
Cleaning up the old rafters before using in the barn


 Bathroom plumbing- all plastic
 More plumbing

 Loft bathroom noggins
 Loft window

 Loft plasterboard
 I met Peppa Pig
 I met a Minion
 Venables Oak
 Oak brought from Shropshire
 Electrician fitting the consumer unit

Using the router to make the work top joint

 Kitchen building

 More kitchen
 Kitchen wall
 Kitchen plumbing
Wood on the walls