Extension Oversite Concrete

Before Andrew the blockwork guru can carry on, we have to sort out the oversite concrete.  The

The first job was to bail the moat out which took 2.5 hours




Then we filled the gap between the blockwork- that took about 5 hours with the concrete mixer going all the time. We used 7:1 lean mix. 

We tamped the concrete and James had a novel technique for finishing off the top.

Job done


Filling the inside

Services entry



 Nearly done

 Just to tidy up final level and sand blinding
 