Bathroom and loft bedroom- window fitted rooms plastered including including distressed wood to the bedroom wall.
Kitchen- kitchen nearly finished
Downstairs bedrooms- floorboards to one wall, Jen has painted the ceilings and walls.
Window ledges finished.
Living room all plastered and Sarah has painted the ceiling.
Second fix electrics- all going in now.
Skirtings and architraves bought along with doors from Venables Oak in Shropshire.
Building the stud work for the loft bathroom and bedroom
James put a vent into the roof for the loft bathroom
Sarah painting the living room ceiling
Cleaning up the old rafters before using in the barn
Bathroom plumbing- all plastic
More plumbing
Loft bathroom noggins
Loft window
Loft plasterboard
I met Peppa Pig
I met a Minion
Venables Oak
Oak brought from Shropshire
Electrician fitting the consumer unit
Using the router to make the work top joint
Kitchen building
More kitchen
Kitchen wall
Kitchen plumbing
Wood on the walls






















No comments:
Post a Comment