The digger came on the 16th December and dug about 100 metres of trenches and started to backfill as we laid the field and brown pipe.
Cut off from the road as the digger crosses the track
Laying the Brown pipe across the track
Working up the back of the barn
Refilling the trench with washed slate
Fitting the gullies
The trench up to the back of the barn